Blog Highlights:
- Introduction | Why is energy storage control important?
- HIL concept | What is HIL testing?
- HIL benefits | Why HIL?
Topics: BESS, Project Update
Topics: BESS, Case Study
Topics: BESS, e-Mobility, Project Update
Topics: Microgrids, BESS, Case Study
Topics: Microgrids, BESS, Case Study
Michele Fusero is an R&D engineer and control specialist for the e-mesh PowerStore Battery Energy Storage System (BESS) at the Grid Edge Solutions Product Group at Hitachi Energy Power Grids. He delivered a talk at the virtual PEDG2021 conference on how HIL became the pillar of the e-mesh solution product development. Watch the video above or read the full blog article to learn more.
Topics: BESS, Case Study
Fuji Electric Co., Ltd.
Power Electronics System Energy Business Headquarters
Power Supply Equipment Development Department
Mr. Kazuyoshi Umezawa, Mr. Motohiro Tsukuta, Mr. Takuya Kimizu (from left to right)
Topics: Microgrids, BESS, Case Study
Blog Highlights
Topics: Microgrids, BESS, Case Study
Blog Highlights
Hitachi Energy Power Grids need to integrate various DERs and control multiple loads in a complex system environment.
Topics: Microgrids, BESS, Case Study
Highlights
Typhoon HIL solutions enable Hitachi Energy Power Grids to push the limits of testing product functionality to cover customer needs throughout the entire product lifecycle.
Controller Hardware-in-the-Loop (C-HIL) is a combination of real hardware controllers interfaced with a real-time simulation of the power system.
Standard models in the Typhoon HIL microgrid library helped save 4-5 months in controller development and testing.
C-HIL technology increased test coverage in a low-cost environment which ensures great product performance and cost-savings for Hitachi ABB customers.
Topics: Microgrids, BESS, Case Study
Highlights
Copyright © 2022 Typhoon HIL, Inc. Privacy policy Terms of Service